物联网 > > 解决方案 > 自然灾害如何预防,政府该怎么做英语作文

自然灾害如何预防,政府该怎么做英语作文

来源:https://www.wlworld.com.cn 时间:2024-07-03 编辑:admin 手机版

一、自然灾害如何预防,政府该怎么做英语作文

【参考范文】

In the past few days, there have been frequent natural disasters, namely earthquakes,mud-rock flow, tsunami, floods and so on, which killed millions upon millions of people, destroyed countless homes. Consequently, large numbers of people have suffered psychic upheaval and deemed the doomsday of earth is coming near.

As a university student, I hope people should be aware that those disasters are not the hints of doomsday, but just retribution of our doings on earth. So as to calm psychic upheaval, we should take actions to stop damaging our home-planet, for instance, do not cut down too many trees in the forests, try to protect environment right start from daily things and make the earth a lovely place suitable to live in.

What’s more, in case of emergencies and disasters, we should keep our head, and rely on ourselves to escape from the disasters.

二、解决水资源短缺的措施的翻译是:什么意思

翻译如下

解决水资源短缺的措施

measures to solve the problem of shortage of water resources

三、200分请将下面一段话翻译成英文,不要“鸡”翻~~

Luan River Power Plant 2 × 300MW units for new units, condensing water, 100% through the fine processing, fine processing of renewable way for tower law, ammoniation runs. Was found in the debugging process resin separation columns Yang Chuan-yang resin mixed with more resin anion resin, resulting in poor regeneration of mixed beds, water quality below standards, can not be achieved ammoniation to run. This paper discusses in depth when the mixture of lipid Yin Chuan-yang phenomenon of the formation of fat causes, possible solutions were compared, and selected the optimal solution. The program went through in the Luan River Power Plant refined processing applications, good results for the fine treatment as well as the safe operation of power plants has laid a good foundation.

5.17 The closure of the furnace demands tight boiler insulation end, Slag seal can be put into all the smoke wind baffle can be closed to observe the hole, man hole, flue duct, Slag and other parts of the water seal during the chemical cleaning must have closed condition, reduce heat loss, so as not to reduce the heating rate to affect the quality of chemical cleaning, temporary cleaning pipes and steam pipes in need of insulation work.

5.18 Boiler basically have the ignition conditions to ensure that the boiler chemical cleaning to fire within 20 days after the blowpipe.

6 chemical cleaning of the provisional system installation and implementation of interim measures

6.1 drum at the top of the exhaust pipe to be all the way up towards the end of the air, the exhaust pipe total effective flow area not less than φ100.

6.2 Drum inside the cyclone in pickling should be removed or not installed before, and process until the chemical cleaning and then back loaded.